• Round Abs Top Shower Mold For Bathroom Use
  • Round Abs Top Shower Mold For Bathroom Use
  • Round Abs Top Shower Mold For Bathroom Use
  • Round Abs Top Shower Mold For Bathroom Use
  • Round Abs Top Shower Mold For Bathroom Use
  • Round Abs Top Shower Mold For Bathroom Use
  • video

Round Abs Top Shower Mold For Bathroom Use

  • fengjin
  • Xiamen,China
  • 35-40days
  • 600set/year
Our factory start to offer customized shower mould since 1998.We have 60% customer from China and 40% from oversea.We have injection machine can finish plastic parts production.

Round Abs Top Shower Mold For Bathroom Use


Manufacturing Technique:injection

Mould Core:S136

Mould Base :45# steel

Cavity:1

Factory Location:Xiamen,China

Supply Capacity: 50-60sets/month

 

Round Abs Top Shower Mold For Bathroom Use have one cavity, 300000 shots require by customer on working life.It will take around 35 days to delivery. Normally 5-7 day for 3D,after customer confirm will start mold production.We'll test and assemble the products to check if every plastic parts work well,then we'll send the goods for customer.If not any change from customer we'll arrange plastic mould delivery.

 shower mould


Round Abs Top Shower Mold For Bathroom Use finish by precise CNC.Bathroom related products mould is parts of our main producs.Some of our customer will order more than 20 sets plastic mould at a time for related products mould.

 

Product Specification:

Round Abs Top Shower Mold For Bathroom Use

factory

mould name

mold cavity

mold core

mold base

mold delivery time

shot(times)

circle time(second)

fengjin

top shower mold

1

S136

45#

40days

300000

95


And we can offer some related products mould like soab case on shower stand and other plastic parts like slidding cover mould,friction pad mould,fasten nut mould,marbles mould,non-slip mat mould,decoration ring moulding,decoration cover of suspension base mold,sprayer body injection mould  and so on. The cavity can decide according to customer's production capacity.Some more mould pics we make for your refer 

top shower plastic mold

Our Injection Factory Shop,we have 15 set injection machine in different size,big and small ,max is 1228ton,can make pastic parts max 1.5*1.2m 

top shower plastic mold

Plastic Injection Mould Manufacturing For Hand Shower

top shower injection mould


Normally we'll have 35-45 days for plastic mold production.Step as below :customer offer samples-our designer finish the 3D and send for customer confirmation-start to design the mold -order the steel - CNC processing-electrosparking-assemble the mould-test the injection mould-send plastic parts sample to clients-packing-delivery-customer feedback -new order 

shower mould

Packing by wood crate

top shower plastic mold



Related Products

Get the latest price? We will reply as soon as possible (within 12 hours)